Our awesome buildings and projects.

POLICE REGIONAL LOGISTIC CENTER - GARDEZ.

This is design to build project consists of the following buildings: Headquarters, Admin Facility, Small Arms Maintenance Shop, Communication Center, ASP, Warehouse, Vehicle Maintenance, Water Sanitation, Power Plant, Road, Parking, Sidewalk, Power Plant and Site electrical distribution.

POLICE REGIONAL LOGISTIC CENTERR KANDAHAR

This was the 2nd RLC which was designed and build by FCC. This was design to build project consists of the following buildings: Headquarters, Admin Facility, Small Arms Maintenance Shop, Communication Center, ASP, Warehouse, Vehicle Maintenance, Water Sanitation, Power Plant, Road, Parking, Sidewalk, Power Plant and Site electrical distribution.

ANP BP COMPANY HQ, ISLAM CHUNKER, BALKH

In spite of the limitations and unavailability of material according to the specification in Afghan local markets we managed to complete the project according RFP.

POLE KHUMRI 220 KV SUBSTATION CAPACITOR BANKS

FCC is responsible for completing civil work of the project, which included but not limited to civil work (trench, foundation for equipment’s, RCC trench for cable network, capacitor building, Road etc.).Pole Khumri substation is a 220 kV, 4 MVA sub-station used to provide power to Pole Khumri area of Baghlan Province..

NATIONAL SECURITY DEPARTMENT KHOST

The project is defined as the design, material, labor, and equipment to construction of National Security Building for Khost Province Intelligence Department which includes double story building with boundary wall, guard towers and other facilities.

BUT KHAK 110/220 KV SUBSTATION

FCC was responsible for completing civil work of the project, which included but not limited to civil work (trench, foundation for equipment’s, RCC trench for cable network, etc.).Butkhak station is a 110/20 kV, 4 MVA sub-station used to provide power to Butkhak area of Kabul province.

NAHID SHAHEED HIGH SCHOOL

Construction, technical equipment, water supply, electrical supply, sewed tank, power supply , Rehabilitation of buildings

KARIM SHAHEED HIGH SCHOOL BAGHLAN PROVINCE

PROJECT OWNER OR PROJECT MANAGER FOR THE CLIENT - PROVIDE: Government (ASP).

DALILEE BRIDGE BAGHLAN PROVINCE

Farzam Construction Company designed-Buld contract a 12m single span one-lane vehicle bridge 6.5 meters wide across the Surkhab River at Dalilee Village, Tala Wa Barfak Distract/Baghlan Province

MILCON RLB CONTENGENCY - LOGAR

The project consists of the design, construction, and erection of Government Furnished Re-Locatable Building (RLB) container modules and related support facilities for 1100 personnel at Forward Operating Base (FOB) Shank located near the village of Pul-E-Alam in Logar Province, Afghanistan. The modules shall be erected in a 2-story building configuration. Coordinate with the Contracting Officer (KO) for the approximate site locations once the contract is awarded. The site will be confirmed by the KO prior to NTP. The project is defined as the material, labor, and equipment to grade the site, construct foundation systems, assemble the RLB modules, move and set RLBs to/on the foundation system, provide sufficient vehicle access roads and parking areas, utilities and any other necessary infrastructure required for the RLB housing project to fully support the design population. This contract provides government furnished RLB units. The work includes site survey; geotechnical investigations; design of concrete foundations; reinforced concrete bunker and blast protection barriers; assembly of RLB container modules; and placing RLB modules (RLB modules shall be secured to foundations and adjacent modules with manufacturer approved/designed connectors, an above ground water storage tank(s), chlorination system, booster pumps, hydro pneumatic tanks; pump house and buried water distribution system; a buried sanitary sewer collection system and sewage holding tank; an electrical service disconnect, transformers; buried power distribution and communication systems.